The 112th Avenue Projects consists of two 16-story office towers with five levels of below grade parking located in the heart of downtown Bellevue. A pedestrian bridge will link the two towers.
The structural design will feature concrete long span office floors with long span framing for the subterranean parking. Floor to floor heights will be optimized to maximize efficiency. The site has a high water table which will require a substantial foundation support system. The project is targeting LEED certification and expected to begin construction in Spring 2021.